Portfolio metal constructions
_____
Below you will find some examples, some projects recently carried out, solutions made to measure, whereby we used various working methods, laying techniques, materials and finishing procedures.

Object
New cable railway “Sassellina” Lugano, Piazza Cioccaro;
Via Borghetto (Cathedral of San Lorenzo);
Railway Station FFS Lugano (Swiss Federal Railways);
Metal works
New ticket office on Piazza Cioccaro, structure in steel and glass
Platform roofing in glass at the cable railway stop of San Lorenzo
Glass fencing along the cable railway line
Railings, handrails, general metal construction works
Dowload pdf
New cable railway “Sassellina” Lugano, Piazza Cioccaro;
Via Borghetto (Cathedral of San Lorenzo);
Railway Station FFS Lugano (Swiss Federal Railways);
Metal works
New ticket office on Piazza Cioccaro, structure in steel and glass
Platform roofing in glass at the cable railway stop of San Lorenzo
Glass fencing along the cable railway line
Railings, handrails, general metal construction works
Dowload pdf
Main features
Carpentry 4000 kg
Glass surfaces 135 sq.m
Railings 165 m
Handrails 63 m
Projecting architects
Gruppo Architetti Stazlu
c/o Studio of architecture Lorenzo Felder
Commissioners
TPL SA (regional public transport company)
City of Lugano
FFS (Federal Railways), division infrastructures
Carpentry 4000 kg
Glass surfaces 135 sq.m
Railings 165 m
Handrails 63 m
Projecting architects
Gruppo Architetti Stazlu
c/o Studio of architecture Lorenzo Felder
Commissioners
TPL SA (regional public transport company)
City of Lugano
FFS (Federal Railways), division infrastructures

Object
Ristructuring of a building at Lugano, via Peri no. 6
Metal works
Metal carpentry for new building front and roofing
Dowload pdf
Ristructuring of a building at Lugano, via Peri no. 6
Metal works
Metal carpentry for new building front and roofing
Dowload pdf
Main features
Carpentry for building front 1900 kg
Carpentry roof 13300 kg
Projecting architects
Studio of architecture Ivano Gianola
Studio of engineering Passera & Associates
Commissioner
Immopal AG
Carpentry for building front 1900 kg
Carpentry roof 13300 kg
Projecting architects
Studio of architecture Ivano Gianola
Studio of engineering Passera & Associates
Commissioner
Immopal AG

Object
Theatre of Architecture, centre for cultural events and expositions, Mendrisio, Via Turconi
Metal works
Lining of the internal roofing surface with aluminium panels of stretched metal sheets
Internal fire resistant doors (steel) El30
Railings, handrails, general metal construction works
Dowload pdf
Theatre of Architecture, centre for cultural events and expositions, Mendrisio, Via Turconi
Metal works
Lining of the internal roofing surface with aluminium panels of stretched metal sheets
Internal fire resistant doors (steel) El30
Railings, handrails, general metal construction works
Dowload pdf
Main features
Lining 550 sq.m
Internal doors 27 unities
Railings 90 sq.m
Handrailings 100 m
Projecting architect
Mario Botta
Commissioner
University of Italian speaking Switzerland
Lining 550 sq.m
Internal doors 27 unities
Railings 90 sq.m
Handrailings 100 m
Projecting architect
Mario Botta
Commissioner
University of Italian speaking Switzerland

Object
New platform roofing for bus stop
Trevano / Canobbio, Via Trevano, between CPT and secondary school
Metal works
Metal carpentry and roofing in processed metal sheets
Dowload pdf
New platform roofing for bus stop
Trevano / Canobbio, Via Trevano, between CPT and secondary school
Metal works
Metal carpentry and roofing in processed metal sheets
Dowload pdf
Main features
Carpentry 8300 kg
Length of covering 70 m
Surface of covering 270 sq.m
Projecting engineers
Engineering Studio Lucchini & Canepa
Commissioners
Partnership SAWA (Saisa SA – Walo Bertschinger SA)
Carpentry 8300 kg
Length of covering 70 m
Surface of covering 270 sq.m
Projecting engineers
Engineering Studio Lucchini & Canepa
Commissioners
Partnership SAWA (Saisa SA – Walo Bertschinger SA)

Object
Footbridge
Centovalli, main road between the villages of Palagnedra and Borgnone
Metal works
Metal structure for the new footbridge
Dowload pdf
Footbridge
Centovalli, main road between the villages of Palagnedra and Borgnone
Metal works
Metal structure for the new footbridge
Dowload pdf
Main features
Carpentry 3700 kg
Length 16 m
Projecting engineers
Engineering Studio Passera & Associati
Commissioners
FART SA (regional coach line of Ticino)
Carpentry 3700 kg
Length 16 m
Projecting engineers
Engineering Studio Passera & Associati
Commissioners
FART SA (regional coach line of Ticino)
ANY MORE QUESTIONS? CONTACT US, WITHOUT COMMITMENT